2-2 Extreme Networks Consolidated Hardware Guide
Site Preparation
Planning Your Site
To install your equipment successfully, you should plan your site carefully. The site
planning process has three major steps:
Step 1: Meeting Site Requirements
Your physical installation site must meet several requirements for a safe and successful
installation:
Building and electrical code requirements
Environmental, safety, and thermal requirements for the equipment you plan to
install
Distribution rack requirements
Step 2: Evaluating and Meeting Cable Requirements
You should evaluate and compare your existing cable plant with the requirements of
the Extreme Networks equipment to determine if you need to install new cables (or
cabling).
Step 3: Meeting Power Requirements
To run your equipment safely, you must meet the specific power requirements for the
Extreme Networks equipment that you plan to install.
Note: Review and follow the safety information located in the user guide for the
equipment you are installing.